Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 7 results ...

Bouraoui, D and Lizarralde, G (2013) Centralized decision making, users' participation and satisfaction in post-disaster reconstruction: The case of Tunisia. International Journal of Disaster Resilience in the Built Environment, 4(02), 145-67.

  • Type: Journal Article
  • Keywords: Decision making; Developing countries; Natural disasters; Post disaster reconstruction; Project management; Stakeholders; Tunisia; Vulnerability
  • ISBN/ISSN: 1759-5908
  • URL: https://doi.org/10.1108/IJDRBE-02-2012-0009
  • Abstract:
    Purpose – The purpose of this paper is to report the results of a study of a post-flood reconstruction project conducted in 2003 in the village of Bousalem in Tunisia, a country that is poorly documented in reconstruction literature and that is known for its high levels of centralization in decision making. It examines the relations between project stakeholders, the structure of the team established to conduct the project (the Temporary Multi-Organisation, TMO) and the most important concerns of end-users. It particularly shows the drawbacks of neglecting a participatory approach and favouring instead the centralization of decision making at different levels of the TMO organisational structure. Design/methodology/approach – Users' satisfaction was assessed through technology transfer indicators, based on the qualitative analysis of several interviews with end-users. The analysis of the organizational system was based on a qualitative analysis of the TMOs' formal and informal structuring. Findings – The results confirm the need to decentralize decisions at a level that: optimizes the efficiency of local stakeholders; facilitates the participation of end-users; and allows an appropriate distribution of responsibilities and risks among stakeholders. Originality/value – The results show how certain decisions related to the structure and functioning of the TMO affect the match between the project initiators' capacity to provide an adequate solution and the users' expectations and requirements after the disaster.

Cennamo, C and Fiore, M D (2013) Best practice of structural retrofit: the SS. Rosario Church in Gesualdo, Italy. International Journal of Disaster Resilience in the Built Environment, 4(02), 215-35.

Dinesh, C P, Bari, A U, Dissanayake, R P G and Tamura, M (2013) Detecting and assessment of tsunami building damage using high-resolution satellite images with GIS data. International Journal of Disaster Resilience in the Built Environment, 4(02), 132-44.

Ophiyandri, T, Amaratunga, D, Pathirage, C and Keraminiyage, K (2013) Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia. International Journal of Disaster Resilience in the Built Environment, 4(02), 236-49.

Roosli, R and O'Keefe, P (2013) Post-disaster housing and management in Malaysia: a literature review. International Journal of Disaster Resilience in the Built Environment, 4(02), 168-81.

Walker, D H T and Steinfort, P (2013) Using an improved rich pictures approach to improve project situational analysis in complex aid reconstruction development projects. International Journal of Disaster Resilience in the Built Environment, 4(02), 182-98.

Walters, E L, Thomas, T L, Corbett, S W, Williams, K L, Williams, T and Wittlake, W A (2013) A Convertible Use Rapidly Expandable model for disaster response. International Journal of Disaster Resilience in the Built Environment, 4(02), 199-214.